有关英文合同三篇
现今很多公民的维权意识在不断增强,能够利用到合同的场合越来越多,签订合同是为了保障双方的利益,避免不必要的争端。合同有不同的`类型,当然也有不同的目的,以下是小编为大家收集的英文合同3篇,希望对大家有所帮助。
英文合同 篇1Contract No.:________________________.
Date of Signature:____________________.
Place of Signature:____________________.
This Contract is made and entered into through friendly negotiation by and between China____________________ (hereinafter referred to as “Client”), as one party, and____________________ (hereinafter referred to as“Consultant”),as the other party, concerning the technical consultancy service of__________, under the following terms and conditions:
Article 1 Contents of Technical Consultancy Service
1.1 Whereas Client desires to obtain the technical consultancy service of from Consultant and Consultant has agreed to perform such services.
1.2 The Scope of Technical Services is defined in Appendix 1.
1.3 The Time Schedule for the Services is shown in Appendix 2.
1.4 The Manning Schedule is described in Appendix 3.
1.5 Consultant shall complete the Services within__________months from the Effective Date of this Contract and furnish the final technical service report, including drawings, designing documents, all kinds of standards and photos, within____months. Consultant shall keep aware, free of charge, Client of the latest development of similar projects and any progress made in order to improve the designing of the project.
Article 2 Both Parties' Responsibility and Liability
2.1 Client shall furnish to Consultant the pertinent data, technical service reports, maps and information available to him and shall give to Consultant the reasonable assistance necessary for carrying out of his duties. Particularly Client shall nominate a general representative who shall be available at reasonable time.
2.2 Client shall assist Consultant with the responsible authorities for obtaining visas, work permits and other documents required by Consultant to enter the country and to have access to the Site of the Project. The above expenses shall be borne by Consultant.
2.3 Consultant shall furnish a sufficient number of competent personnel to perform its obligation hereunder, in addition to those personnel specifically listed in Appendix 3. All personnel employed by Consultant in carrying out the work shall be exclusively Consultant's responsibility, and Consultant shall hold Client harmless from any claims of any kind by Consultant's personnel arising out of any acts by Consultant or its personnel in connection with the work performed hereunder.
2.4 Consultant shall provide Client all the technical technical service reports and relevant documentation within the Scope of Technical Services and within the Time Schedule of the Time Schedule for the Services.
2.5 Consultant shall assist Client'S personnel in his country ……此处隐藏6136个字……3.5 the cost of the related tools and tools for other processes that are prepared for the normal production of the product.
1.4 when the written request of the buyer the seller according to the change of the product design for the mould modification, if the mould modification is relatively simple, including less mold material changes and other simple changes from the mold, the seller to the buyer without charges; if the modification is complex, great influence on the whole structure of the mold, then the seller according to the modified working hours for mold to the buyer by the buyer offer, the corresponding mold modification cost. The buyer shall not bear any responsibility for the repair or modification of the mold due to the seller's reason, due to the failure of the mold to meet the buyer's requirements.
1.5 by the seller to the buyer's manual and cost technical support from the normal cost, the Seller shall give the buyer recognized the way the corresponding compensation.
2. the progress of the model:
2.1 after the seller has received the product drawing file after the buyer's confirmation, that is,
The cost of artificial / stop line formation. The two parties may sign separately the raw material for production.
3. if the seller has caused the seller to the buyer of the product quality and schedule is not up to the requirements of the buyer, the buyer and customer missed the best time to market, or the buyer was forced to cancel the project, so that the buyer and its customers suffer serious losses and loss of material research, in addition to the seller to refund all previous the buyer to pay the purchase price, depending on the actual situation of the seller also bear the buyer direct and indirect economic losses.
4., if the seller is unable to resist force, including the war, fire, strike, and other force majeure caused by Chinese law, the buyer will allow the buyer to dismiss it. The Seller shall notify the buyer in written form within 24 hours after the occurrence of the force majeure, and the seller is obliged to take all necessary measures to deliver the goods as soon as possible. If the force majeure continues for more than 2 weeks, the buyer has the right to cancel this contract.
5. other unfinished matters: implemented in accordance with the economic contract law.
Eight. Dispute settlement
Any dispute arising from the execution of this contract shall be settled through friendly negotiation first. If no negotiation can be reached within 30 days, either party can submit the dispute to the municipal court.
The parties to this contract shall be strictly enforced. If one party fails to perform the contract in the cause of the contract, the party must ask for the consent of the other party two weeks in advance, and the contract shall be terminated.
The buyer: the seller: ____________ ____________
Representative: Representative: ___________ ____________
文档为doc格式